Fort Jackson Central Energy Plant #1 Electrical Repairs, South Carolina

Service:

Architecture / Engineering

Sector:

Federal

Size:

5,000 SF

Location:

South Carolina
Fort Jackson Central Energy Plant #1 Electrical Repairs, South Carolina

Fort Jackson, South Carolina,  wanted to add 3 Maximum Overload Protection Devices to three chillers located at the Central Energy Plant #1. A site study was conducted and Cromwell provided full design documents and specifications to install new protection devices in the building’s interior and to remove the existing switches that were located on the exterior of the building.