Defense Logistics Agency Building 81 Renovation, New Cumberland, PA

Service:

Sector:

Size:

62,021 SF

Location:

Defense Logistics Agency Building 81 Renovation, New Cumberland, PA

Design of the Defense Logistics Agency (DLA) Building 81 Renovation located at the Defense Distribution Center, Susquehanna facility located in New Cumberland, Pennsylvania. Building 81 was constructed in 1951 and is currently the Global Headquarters building for DLA Distribution. Extensive renovations were required to the fire suppression, communication, electrical and the HVAC systems within this building. In addition, some interior and exterior architectural enhancements were completed as part of this project.
 
The project included the preparation of a construction bid package to be used for competitive bidding of improvements.
 
The design package included a 1391, calculations, design drawings, cost estimates, catalog cuts, specifications and other applicable documentation to provide a complete package.
 
The design was in accordance with the Unified Facility Criteria, International Codes, NFPA 101, LEED, DLA Policies/Regulations/Guidance, Federal High Performance Building requirements, state, local and federal regulations.
 
The Building 81 renovations include the following:
Repair exterior of the building by cleaning (washing) and painting of the exterior finish insulation system.
New ADA compliant pathway to main entrance of building.
Interior repair/renovations include groundwater remediation, ceiling tiles, wall finishes and stairwell renovations.
Repair of aging steam heating system by replacement with new hot water heating system for the entire building. These repairs include replacement of air handling units, fan coil units, unit heaters, piping, controls, etc. Utilized natural gas fired boilers for the generation of hot water for building heating. Repair by replacement an air cooled chiller sized for the appropriate cooling load for the entire building.
Repair of existing Building Management System (BMS) by replacement with a new BMS system.
 

Veteran's Affairs Radiology and Nuclear Medicine

Service:

Sector:

Size:

22,000 SF

Location:

Veteran's Affairs Radiology and Nuclear Medicine

The project program is a partial renovation of the radiology department located on the first floor including Mammography and Interventional Radiology.

National Center for Toxicological Reseach Building 6 Demolition Design

Service:

Sector:

Size:

N/A SF

Location:

National Center for Toxicological Reseach Building 6 Demolition Design

The National Center for Toxilogical Reaseach in Jefferson, Arkansas is renovating a number of their buildings to adapt them for new use and functionality. Cromwell provided drawings of the exsiting Building 6 and provided demolition plans to aid with the renovation.
 

Commissary and Central Distribution Center Renovation, Osan, Democratic People's Repulic of Korea

Service:

Sector:

Size:

115,226 SF

Location:

Commissary and Central Distribution Center Renovation, Osan, Democratic People's Repulic of Korea

Osan Commissary and Central Distribution Center in Osan, Korea is undergoing an architectural, interior, and refrigeration upgrade of the existing 115,226 SF building within a limited budget. Cromwell will be assisting with a Charette, design documents, and shop drawing reviews.
 

UAMS JF Shorey 6th Floor Offices Renovation Commissioning

Service:

Sector:

Size:

N/A SF

Location:

UAMS JF Shorey 6th Floor Offices Renovation Commissioning

Cromwell Energy Services completed a thorough review of the 100% design documents completed for the University of Arkansas for Medical Sciences’ Shorey 6th Floor Offices. The Commissioning Team organized the commissioning process components and conducted pre-construction meetings where the commissioning process requirements were reviewed with all members of the team. They also coordinated and directed commissioning activities in a logical, sequential and efficient manner using consistent protocols, clear and regular communications and consultations with all necessary parties, frequently updated timelines, schedules, and technical expertise. Site visits, review submittals, and communication with the contractors were also included in the scope of services. Cromwell has assisted with commissioning efforts in most new construction at the school over the past 3 years. 
 

UAMS Walker Annex Dock Commissioning

Service:

Sector:

Size:

N/A SF

Location:

UAMS Walker Annex Dock Commissioning

Cromwell Energy Services completed a thorough review of the 100% design documents completed for the University of Arkansas for Medical Sciences’ Walker Annex Doc. The Commissioning Team organized the commissioning process components and conducted pre-construction meetings where the commissioning process requirements were reviewed with all members of the team. They also coordinated and directed commissioning activities in a logical, sequential and efficient manner using consistent protocols, clear and regular communications and consultations with all necessary parties, frequently updated timelines, schedules, and technical expertise. Site visits, review submittals, and communication with the contractors were also included in the scope of services. Cromwell has assisted with commissioning efforts in most new construction at the school over the past 3 years. 
 
 

UAMS Jones Eye Institute 9th Floor Clinic Renovation Commissioning

Service:

Sector:

Size:

N/A SF

Location:

UAMS Jones Eye Institute 9th Floor Clinic Renovation Commissioning

Cromwell Energy Services completed a thorough review of the 100% design documents completed for the University of Arkansas for Medical Sciences’ Jones Eye Institute 9th Floor Clinic Renovation. The Commissioning Team organized the commissioning process components and conducted pre-construction meetings where the commissioning process requirements were reviewed with all members of the team. They also coordinated and directed commissioning activities in a logical, sequential and efficient manner using consistent protocols, clear and regular communications and consultations with all necessary parties, frequently updated timelines, schedules, and technical expertise. Site visits, review submittals, and communication with the contractors were also included in the scope of services. Cromwell has assisted with commissioning efforts in most new construction at the school over the past 3 years. 
 

UAMS Jones Eye Institute 5th Floor Clean Room Commissioning

Service:

Sector:

Size:

N/A SF

Location:

UAMS Jones Eye Institute 5th Floor Clean Room Commissioning

Cromwell Energy Services completed a thorough review of the 100% design documents completed for the University of Arkansas for Medical Sciences’ Jones Eye Institute 5th Floor Clean Room. The Commissioning Team organized the commissioning process components and conducted pre-construction meetings where the commissioning process requirements were reviewed with all members of the team. They also coordinated and directed commissioning activities in a logical, sequential and efficient manner using consistent protocols, clear and regular communications and consultations with all necessary parties, frequently updated timelines, schedules, and technical expertise. Site visits, review submittals, and communication with the contractors were also included in the scope of services. Cromwell has assisted with commissioning efforts in most new construction at the school over the past 3 years.

 

 

UAMS Gallery Phase III Commissioning

Service:

Sector:

Size:

N/A SF

Location:

UAMS Gallery Phase III Commissioning

Cromwell Energy Services completed a thorough review of the 100% design documents completed for the University of Arkansas for Medical Sciences’ Gallery. The Commissioning Team organized the commissioning process components and conducted pre-construction meetings where the commissioning process requirements were reviewed with all members of the team. They also coordinated and directed commissioning activities in a logical, sequential and efficient manner using consistent protocols, clear and regular communications and consultations with all necessary parties, frequently updated timelines, schedules, and technical expertise. Site visits, review submittals, and communication with the contractors were also included in the scope of services. Cromwell has assisted with commissioning efforts in most new construction at the school over the past 3 years. 
 

UAMS College of Public Health Building, EDII Renovation Cx

Service:

Sector:

Size:

N/A SF

Location:

UAMS College of Public Health Building, EDII Renovation Cx

Cromwell Energy Services completed a thorough review of the 100% design documents completed for the University of Arkansas for Medical Sciences’ College of Public Health Housing. The Commissioning Team organized the commissioning process components and conducted pre-construction meetings where the commissioning process requirements were reviewed with all members of the team. They also coordinated and directed commissioning activities in a logical, sequential and efficient manner using consistent protocols, clear and regular communications and consultations with all necessary parties, frequently updated timelines, schedules, and technical expertise. Site visits, review submittals, and communication with the contractors were also included in the scope of services. Cromwell has assisted with commissioning efforts in most new construction at the school over the past 3 years. 
 